Fucich LLC has the capabilities to cut aluminum buss duct and re-weld it. We have done it on several sites.
- On one site the big transformer that the buss runs to had to be replaced. We cut the three runs of buss duct and came back and welded them back when the new transformer was in place.
- On another site we were asked to supply ½” aluminum threaded fittings to be welded on to each buss duct to order monitor the positive pressure inside the duct.
- We have fabricated aluminum wall panels in our shop for blower enclosures at a lignite plant.